Ece ojt

Each students were assigned to an Engineer who will be in charge for training us in the company.

Ece Ojt Narrative Report Summer 2014

Fourth Week, April 20 — April 25, Panlilio because my FO was still not around that day. There are times I hesitate to ask Engr. More linkages must be established related to the field of specialization provided by the school in order to match the skills needed by the company.

Some examples of site selfies taken from different sites: To gain more knowledge outside I decided to go with the other team, and good thing Ece ojt of the three members was absent that day, then I go. Afterwards, we visited Xevera Mabalacat site.

ECE Apprenticeship

First Week, March 30 — April 1, On the first day of my training, March 30, it was started with a discussion. It is found out that this site is also down. When everything became okay and done,we drive to Mexico Digitel site for site selfie, checking and listing deficiencies that will be needed for SID.

The site is noted as a down site due to fiber cut.

Second Week, April 6 — April 11, Give the students an insight of the various operations, processes, techniques and controls presently used in industry; 4. On the last day of the week, Saturday, from Dau Mabalacat we went to Talang Candaba for trtoubleshooting signal status of the site.

That was another learning aside from working in the field. On Thursday, there was a discussion about GSM network how it functions. That was another learning and knowledge. Third Week, April 13 — April 18, The microwave of Porac site is facing another site located in Dila-Dila which are interconnected to each other.

The next day, I worked for the work order in the office which Engr. We just had 4 site destinations. I learned what the MTS main function and how it works to a site.New Ojt, for, ece, college, students Jobs in Philippines available today on JobStreet - Quality Candidates, Quality Employers, vacancies.

ECE OJT Company killarney10mile.com - Download as Word Doc .doc /.docx), PDF File .pdf), Text File .txt) or view presentation slides online/5(3). Violation of this will merit deductions from the grade of ECE Duties and Responsibilities of a Host Company.

1. Through the immediate supervisor through the human rsource department, ensures that the OJT student undergoes work technical in nature and related to ECE.

2. Ensures a safe working environment for students undergoing OJT. INTRODUCTION ECE 49 – Practicum deals with the application of knowledge and skills of the students in Bachelor of Science in Electronics and Communications Engineering.

3.

monthly and narrative reports) in order to properly document all the learnings/skills that they acquired after the OJT. On‐the‐job training (OJT) is defined at WIA section (31).

OJT is provided by an employer in the public, private non‐profit, or private sector. from their immediate superiors/evaluators during OJT and qualitatively interpreted and compared the results of annotations among four engineering programs under study.

B. Participants. The study included the performance appraisal report of engineering students who were enrolled in their OJT from to

Download
Ece ojt
Rated 5/5 based on 32 review